Raging River Hydropower Project

The Raging River Project involves the re-development of an existing hydropower facility on the shore of Benson Lake, located on Vancouver Island, British Columbia. The existing 2 Megawatt powerplant was replaced with an 8 Megawatt facility through the construction of a larger penstock and installation of new generating equipment. The facility features an 84 hectare reservoir controlled by a large dam. Construction was completed in early 2012.

Our Role in the Project

  • Completing the Environmental Assessment required to obtain project permitting including wildlife, vegetation, water quality, fish and invertebrate population studies and instream flow assessments.
  • Environmental monitoring for construction
  • Data collection and analysis to support the Long-Term Environmental Monitoring Program (OEMP).